RDX 6 Inch Leather Gym Belt

€33,99
Tax included.
WBS-6FB-S
Size: S
WBS-6FB-S
Color: Black
Approved by

Product Description

Harness unbelievable power with this extra wide leather weight lifting belt. Designed to give you the highest levels of back support and therefore giving you better strength and confidence to stack to the max. Made from a special Nubuck leather that feels gel-like when compressed, you’ll have all the cushioning you need for the toughest workouts. And this exercise belt also features a contoured design for extra comfort, shock absorbing properties to protect your back and abdomen, plus rivets and buckle for even more toughness. All this whilst feeling incredibly soft on the skin. Accredited by Global Powerlifting Congress, approved and recognized the International Power-lifting League (IPL) United States Power-lifting Association (USPA)

  • Oil tanned Nubuck leather construction with a gel-like touch to support and cushion
  • Designed to be soft on the skin yet completely indestructible in the gym
  • Shock absorbing abilities to deliver a pain-free experience
  • Contoured design to mould to your body and give you the ultimate comfort
  • Stitched underpinning with rivets and buckle for added strength and resilience
Shipping & Return Policy
Delivery
  • Delivery within Europe will be within 4-5 working days.
  • For delivery rates of heavy items to your destination, please click here.
Returns
  • In case you are not satisfied with the product or due to any other reason, you may return the item to us for a 100% refund.
  • For returning a heavy item, a collection will be arranged at your doorstep or Prepaid return label will be provided for heavy item(s) return purpose. click here

FREE AND EASY RETURN

30 GUARANTEE DAY

EXCEPTIONAL CUSTOMER SERVICE

Size: S
Color: Black

A Whole New Level of Greatness

Get ready for the most resilient Weightlifting experience! Crafted from premium Nubuck leather, this belt is designed for elevated performance with its 6-inch width and 10mm thickness - backed by meticulous design engineering to ward off cracks, splits, or tears. Now you can bring your A-game to the gym and powerlift like never before!

No More Slips and Slides

Our RDX Leather Weightlifting Belt is your ultimate partner in the gym. Featuring a strong HG steel buckle and multiple rivets, this belt ensures tremendous staying power and absolute security as you sail through heavy lifts with ease. The impressive buckle keeps it snugly wrapped around your waist, so you never have to take your eyes away from executing perfect form!

Be the Unbeatable Beast!

This leather weightlifting belt offers more than just looks!  It helps you push yourself past your usual limits. With our gym belt that support comes with an extra dimension: its perforated and sweat-wicking design helps keep you dry and comfortable by soaking up the sweat and providing a ventilated environment - so no need to worry about dragging those extra pounds of water around the gym!

Push Yourself to Your Personal Best

Take your gym session to the next level with our powerlifting belt! Lined with industrial-grade stitching and layers of suede leather, this belt not only provides you with extra grip to make heavy-duty lifts easier, but it also gives optimal lumbar support for improved performance. No more uncomfortable jolts during your workout get ready to take control like never before!

Conquer Your Workouts

When it comes to nailing your squats and pushing yourself to the limit, nothing compares to your ideal fitness companion - a trusty gym belt. This versatile accessory is designed to comfortably hug your core while allowing you to add extra weight to expand your range of movement and increase strength gains during exercises. Put it on before each workout and you'll soon feel the difference!

Get Ready to Rock Those Lifts!

Whether you're doing burpees or lifting heavy weights, our gym belt is here to keep your body safe! Thanks to its contoured design, it fits snugly against your body while offering unbeatable protection. While it feels soft and comfortable on the skin, don't be fooled by its soft exterior - it's completely indestructible in the gym!

FAQ's

ARE MY CREDIT CARD DETAILS SAFE AND SECURE WHEN I SHOP AT RDX WEBSITE?

Shopping with RDX is 100% safe & secure! We value our customer’s information and value their presence. Please review RDX Privacy Policy for further details.

DOES RDX OFFER ANY GUARANTEE FOR THE PURCHASES I MAKE?

We promise 100% satisfaction - guaranteed. If you are not satisfied with the product (for various reasons), you may return your purchase. Please review our Return/Refund policy.

IS ORDERING ONLINE WITH RDX SECURE FOR ME?

We value our customers and your information is of the utmost concern, ensuring a safe and secure medium of transaction. The server that hosts our e-store encrypts the transmission of all credit card and personal customer information using the Internet-standard SSL (Secure Sockets Layer) protocol. During the encryption process, information is stored in small bits of code that cannot be read as they travel to us over the Internet. If you have additional questions about the security of ordering online, please feel free to e-mail us at [email protected].

HOW DO I VIEW WHAT’S IN MY SHOPPING CART?

To view the contents of your cart, click on the Shopping Cart button at the top right corner of your screen. Once you click on that button, you can easily change the quantity of the item in your cart by updating the quantity listed and then clicking the Update Shopping Cart option. You can also delete any item added in your cart by clicking the Remove Button and then updating your cart with the Update Shopping Cart button.

WHEN DOES MY CREDIT CARD GET CHARGED?

To ensure you are totally satisfied with your purchase, RDX will not charge your credit card until your order has been shipped.

DOES MY BILLING ADDRESS HAVE TO MATCH THE ADDRESS ON FILE WITH MY CREDIT CARD?

Yes, for credit card verification you must enter your billing address exactly as it appears on your credit card statement.

Recently viewed products

Describe your recently viewed products here